Brand new Maronda Homes Miramar B4 plan with estimated completion date of November 2024. CBS construction with full builder warranties.Terrific plan featuring large great room, 9'4'' volume ceilings, solid surface tops in kitchen, extensive ceramic tile flooring,refrigerator, blinds, lanai and much, much more.
VERANO SOUTH PUD 1 - POD G - PLAT NO. 2
Cooktop, Dishwasher, Disposal, Range - Electric, Refrigerator
All listings featuring the BMLS logo are provided by Beaches MLS Inc. Copyright 2024 Beaches MLS. This information is not verified for authenticity or accuracy and is not guaranteed.
© 2024 Beaches Multiple Listing Service, Inc. All rights reserved.
Listing information last updated on May 14th, 2024 at 7:22am CDT.